Skip Ribbon Commands
Skip to main content

Production Technologist

رمز الوظيفة
CCEDSBS-0421-00191
تاريخ الاعلان
Apr 20, 2021
آخر موعد
May 01, 2021
إسم الشركة
CC Energy Development
التخصص
Subsurface
عدد الوظائف
1
نوع الوظيفة
Permanent
نوع الوظيفة
Office
أدخل الجنسية
Omani
المؤهل ، والخبرات المطلوبة
المؤهل
الخبرة
Bachelor
6

الوصف الوظيفي

• To identify or suggest artificial lift system, carry out detailed ESP design and optimize its performance.
• To work closely with operations, engineering, well engineering, well intervention and other service providers and contractors to enhance and optimize production from existing fields.
• To carry out full well modeling (Prosper) with the ability to analyze and identify remediation candidates to improve production.
• To develop and execute effective well and reservoir surveillance programs.
• To support deployment of technology to improve well & reservoir performance in water flooded fields, tight clastic and carbonate reservoir, and heavy oil.
• To enhance injection and production profiles within the well bore to improve water flood recovery through re-completions, selective isolation using patches, and conformance control agents.
• To identify, evaluate and recommend well interventions to optimize injection placement and withdrawals.
• To identify, evaluate and recommend remedial well work to improve inflow performance through stimulation, additional and/or improved perforations.

المهارات المطلوبة

• BS degree or higher in Petroleum Engineering or equivalent.
• Minimum 6 years’ experience in Production Technology with an oil and gas operator.
• Highly skilled Production Technologist with experience in managing a range of different variety of well intervention activities.
• Experienced in various types of artificial lifts
• Technically strong in own PE field with good all-around knowledge of other PE disciplines.
• Excellent communication skills and ability to contribute as a team player.

تفاصيل الوظيفة الاخرى