You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
Joint Recruitment Portal Arabic
Currently selected
Home
عن البوابة
تواصل معنا
سياسة الخصوصية
الشروط والبنود
الأسئلة الشائعة
Subscribe to news letter
survey
Details
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Lists
Recent
Joint Recruitment Portal Arabic
Currently selected
Home
عن البوابة
تواصل معنا
سياسة الخصوصية
الشروط والبنود
الأسئلة الشائعة
Subscribe to news letter
survey
EN
عربي
تسجيل الدخول
التسجيل
الصفحة الرئيسية
عن الموقع
سياسية الخصوصية
الشروط والبنود
الأسئلة الشائعة
حسابي
اتصل بنا
Details
القائمة
الصفحة الرئيسية
عن البوابة
البحث عن الوظائف
الأسئلة الشائعة
الحساب الخاص بي
Mobile app
تواصل معنا
Hydrocarbon Accountant
رمز الوظيفة
CCEDSBS-0421-00169
تاريخ الاعلان
Apr 11, 2021
آخر موعد
May 01, 2021
إسم الشركة
CC Energy Development
التخصص
Subsurface
عدد الوظائف
1
نوع الوظيفة
Permanent
نوع الوظيفة
Office
أدخل الجنسية
Omani
المؤهل ، والخبرات المطلوبة
المؤهل
الخبرة
Bachelor
5
الوصف الوظيفي
• Work with Company Systems (AVOSET and OFM) to review production data received from the fields. Investigate anomalies and ensure the accuracy and validity of data.
• Verify integrity of base data supplied from measurement systems prior to its use in the Hydrocarbon Accounting system.
• Perform data validation on the Hydrocarbon Accounting system outputs including Well Allocation, Field Allocation and Station Allocation.
• Provide suggestions and improvements to allocation and reporting procedures.
• Interface with chemistry laboratory and incorporate validated sample analysis results into the allocation process.
• Timely preparation (including resolution of any discrepancies) of production reports capturing correctly the results of the allocation procedures.
• Maintain compliance with Production Loss/Deferment Management Process and Loss/Deferment Categorisation ensuring accurate and comprehensive Production Loss database maintained.
• Liaise with relevant departments to ensure representative well tests are being used for the allocation. Advise when a new well test may be required.
• Monitor, allocate and prepare appropriate internal/external reports for products associated with hydrocarbon production.
• Identify through reporting short/medium term opportunities for Production Optimisation.
• Perform production analysis, and optimize production under surface and reservoir constraints with liaison with WRM teams.
• Perform material balance (MB), pressure transient analysis (PTA) and rate transient analysis (RTA) studies.
• Build IPR based on well productivity, determine operating point base on tubing performance curve.
• Generate model inputs necessary for reservoir simulation such as VLP curve, surface or bottom hole pressure constraints.
• Perform nodal analysis, tubing lift calculations, tubing lift evaluation.
• Design, analyse and optimize artificial lift systems including but not limited to ESP, rod lift, jet pump etc.
المهارات المطلوبة
• BS degree in Petroleum Engineering or equivalent
• Minimum of 5 years’ experience in Hydrocarbon Accounting with an oil operator.
• Skilled with AVOCET and OFM systems
• High level of computer literacy. Competent with good problem solving skills.
• Excellent communication skills and ability to contribute as a team player.
• Fluency in written and spoken use of the English language is required
تفاصيل الوظيفة الاخرى
قدم الآن
Share on Facebook
Share on Twitter
Share on LinkedIn